Another lovely day for cruising. Pup-out light came on in the morning. Church Minshull was £21 + Blue so we went on to Middlewich. Kings Lock Chandlery gave me the 30 litres of diesel they'd promised as part of filling the tank.
138 litres diesel (81 engine hours). Pump-out at Middlewich Boats: £15 including blue.
Went through the first three northward locks and tied up on the 48 hour moorings before the recreation ground.
Calculated 160 engine hours since last engine service (Oct 2013 / 1000 miles).
8 miles, 6 locks, 5 hours engine
Tuesday, 9 September 2014
Monday, 8 September 2014
Tattenhall marina to Sykes Hollow
Mixture of cloud and sunshine. Lot of traffic coming the other way. Put some preservative on the wooden chimney collar support before we left and again in the evening.
10.3 miles, 7 locks, 6 hours engine
10.3 miles, 7 locks, 6 hours engine
Saturday, 6 September 2014
Chester to Tattenhall marina
Came up the Chester staircase and the next 5 locks with NB No Brass. Stopped to fish for their dropped windlass. Weather mixed, with a little sprinkling of rain at the start. Let the engine running while we stopped at Tesco and again when we looked for the windlass.
9 miles, 8 locks, 7 hours engine
9 miles, 8 locks, 7 hours engine
Friday, 5 September 2014
Ellesmere Port to Chester
Sunny morning, grey afternoon. Finished going round the rest of the museum, and tried to see Dawn, but she wasn't there today. Filled up with water at the museum tap – that meant having to move the trip boat.
Masses of weed for the first part of the trip. Lunch at Bridge 134. Tied up in the basin at Chester, deciding not to go up the staircase tonight.
9 miles, 2 locks, 4.5 hours engine
Masses of weed for the first part of the trip. Lunch at Bridge 134. Tied up in the basin at Chester, deciding not to go up the staircase tonight.
9 miles, 2 locks, 4.5 hours engine
Thursday, 4 September 2014
Shroppie Bridge 134 to Ellesmere Port
Another good day for travelling. Booked in with the Museum personnel and tied up in the lower basin. Explored quite a lot of the museum and went for a walk to see the Manchester Ship Canal.
5 miles, 2 locks, 3 hours engine
5 miles, 2 locks, 3 hours engine
Wednesday, 3 September 2014
Chester to Shroppie Bridge 134
Nice day for travelling, and came down the Chester staircase with Tony and Karina on NB No Brass. Hardly any traffic on the Shroppie. Tied up just before Bridge 134 to meet up with Alastair and Sue.
4.5 miles, 3 locks, 2 hours engine.
4.5 miles, 3 locks, 2 hours engine.
Tuesday, 2 September 2014
Tattenhall marina to Chester
Lovely warm, sunny day. Shared the locks down into Chester with NB Chief. Moored up on the 48 hour moorings in the centre, trusting everything will be OK here. There are five or six other boats here, so a measure of shared security.
7.5 miles, 5 locks, 3.5 hours engine
7.5 miles, 5 locks, 3.5 hours engine
Sunday, 31 August 2014
Tattenhall marina to Wharton's lock and back
David and Jo, Lewis and Charis came for a sunny Sunday afternoon's boating, with food. Great time. Tried three times to moor up on the towpath on the way back to cook the evening meal, but couldn't get near enough without grounding.
6.3 miles, 2 locks, 4 hours engine
6.3 miles, 2 locks, 4 hours engine
Friday, 22 August 2014
Sykes Hollow to Tattenhall Marina
Mostly cloudy, occasional shower, a little sun. Started at 8.30. Even so we were pushing it a bit to get to Tattenhall in time to complete the rest of the journey home.
Some of the gates / paddles on the wide locks on the Shroppie were appallingly difficult.
10 miles, 7 locks, 5 hours engine
Some of the gates / paddles on the wide locks on the Shroppie were appallingly difficult.
10 miles, 7 locks, 5 hours engine
Thursday, 21 August 2014
Middlewich to Sykes Hollow
Early phone calls to Tattenhall and Leightons indicated (a) we could stay at Tattenhall marina, no problem; (b) it was not imperative to get the eye tests done immediately, but my lenses probably needed to be replaced – one of them is four years old. We decided to go home to have all that done, which probably means leaving Erin Mae at Tattenhall for about a week. So instead of calling with Kings Lock Chandlery today, we came straight on up the Middlewich Branch.
Grey day with occasional spots of rain. Most of the traffic against us except for one very slow learner / hirer in front for the last hour before a late lunch opposite the Aqueduct marina. Only one other boat tied up at Sykes Hollow when we arrived.
7.5 miles, 2 locks, 3 hours engine
Grey day with occasional spots of rain. Most of the traffic against us except for one very slow learner / hirer in front for the last hour before a late lunch opposite the Aqueduct marina. Only one other boat tied up at Sykes Hollow when we arrived.
7.5 miles, 2 locks, 3 hours engine
Wednesday, 20 August 2014
Wheelock Lock 61 to Middlewich
Up early to prepare for getting through the problem pound and lock, but first rumours were that it wasn't going to happen. So ran the engine from 8 as a battery charging measure. However, CaRT going us all moving reasonably quickly, even though the pound was still low.
Rain at lunch-time, but a sunny afternoon, so came on to Middlewich. All that meant the engine did a good stint today. Wanted to moor before Kings Lock, but there wasn't a lot of room, so came round on to the Middlewich branch of the Shroppie. Nice 48 hour mooring just before the second bridge.
7.5 miles, 12 locks, 8 hours engine
Rain at lunch-time, but a sunny afternoon, so came on to Middlewich. All that meant the engine did a good stint today. Wanted to moor before Kings Lock, but there wasn't a lot of room, so came round on to the Middlewich branch of the Shroppie. Nice 48 hour mooring just before the second bridge.
7.5 miles, 12 locks, 8 hours engine
Tuesday, 19 August 2014
Rode Heath to Lock 61
Horrible morning forecast (and realised), so got up late. Set out at 11 as the showers were beginning to die away. Usual mixture of straightforward and horrible lock gear. Nice sunny afternoon.
Encountered a stoppage due to failure of lock 63, so ended up in a long queue above lock 61, to wait overnight. Went down to see CaRT working on the lock, and we're promised we'll be on the move in the morning.
3 miles, 8 locks, 3.5 hours engine
Encountered a stoppage due to failure of lock 63, so ended up in a long queue above lock 61, to wait overnight. Went down to see CaRT working on the lock, and we're promised we'll be on the move in the morning.
3 miles, 8 locks, 3.5 hours engine
Monday, 18 August 2014
Westport Lake to Rode Heath
Sunshine and showers as we came through Harecastle tunnel and down the Cheshire locks to Rode Heath. Some of the paddles were really stiff. Wind was a problem when trying to navigate some of the short pounds. An oncoming boater emerging from lock 52 was very slow. At the same time the bywash suddenly increasing from the pound above took Erin Mae's stern, and drove the bows right across the pound and almost into the oncoming boat.
Moored up just short of the winding hole at Rode Heath. Nice spot with a good view across the valley.
6.5 miles, 12 locks, 6 hours engine
Moored up just short of the winding hole at Rode Heath. Nice spot with a good view across the valley.
6.5 miles, 12 locks, 6 hours engine
Sunday, 17 August 2014
Barlaston to Westport Lake
Windy, sunshine and showers, some very heavy. Late lunch at the top of the Stoke locks before the final hour to the Westport Lake moorings. Wind made some manouevering very tricky.
8 miles, 6 locks, 5.5 hours engine
8 miles, 6 locks, 5.5 hours engine
Saturday, 16 August 2014
Weston to Barlaston
Woke up to find the gas had run out – the spare, to my surprise, was also empty. That meant a quick start to get up to Stone for replacements.
2 gas cylinders from chandlery in Stone. Late lunch above the 4th lock. Then decided to push on through the Meaford flight, and tied up just after bridge 103 in Barlaston.
10 miles, 10 locks, 7 hours engine
2 gas cylinders from chandlery in Stone. Late lunch above the 4th lock. Then decided to push on through the Meaford flight, and tied up just after bridge 103 in Barlaston.
10 miles, 10 locks, 7 hours engine
Friday, 15 August 2014
GH Marina to Weston
Bought a new mooring line from GH Marina.
Phoned Ribble link office, who advised that the earliest date for north passage would be 23rd September, so change of plan needed. Will probably try to traverse the Pennines via the Leeds and Liverpool, since Nicholson's says the locks are 60 feet.
Setting out, went via Anglo-Welsh and bought a spare throttle / gear cable. Keith gave me a plastic cover he had for the Morse control lever hub.
Having set out late, only made it just north of Weston lock before tying up for the night.
3 miles, 2 locks, 3 hours engine.
Phoned Ribble link office, who advised that the earliest date for north passage would be 23rd September, so change of plan needed. Will probably try to traverse the Pennines via the Leeds and Liverpool, since Nicholson's says the locks are 60 feet.
Setting out, went via Anglo-Welsh and bought a spare throttle / gear cable. Keith gave me a plastic cover he had for the Morse control lever hub.
Having set out late, only made it just north of Weston lock before tying up for the night.
3 miles, 2 locks, 3 hours engine.
Thursday, 14 August 2014
Purchases
Ribble link website advised certain items were mandatory, so bought lifejackets and extra length of anchor rope from MC in Penkridge. Also bought stainless steel chimney and a galvanised liner. Discussed paint for the chimney collar and concluded hull blacking paint would do.
Tuesday, 5 August 2014
Saturday, 2 August 2014
Friday, 1 August 2014
Wolseley Bridge to Wolseley Bridge
Went up to Rugeley for ice-cream. Winded and came back to Bridge 70. Another visit to the wildlife centre.
6 miles, 0 locks, 3 hours engine
6 miles, 0 locks, 3 hours engine
Subscribe to:
Posts (Atom)