Hot sunny day. Got cruising at about 10 and made very good progress down the Audlem flight. Water at the Shroppie Fly and mooring at the the end of the 48 hour moorings below the next lock. Dropped a windlass as we were tying up and couldn't find it with the magnet.
2.8 miles, 13 locks, 3.7 engine hours
Saturday, 17 September 2016
Friday, 16 September 2016
The Wharf Tavern to Adderley
Promised early showers did not appear. Left mid-morning, down the Tyrley flight to Market Drayton. Stopped there for lunch and a bit of shopping. Pushed on mid-afternoon and thought about stopping above the Adderley flight. The shelf was too severe so we went down the flight to the visitor moorings below. No Three or TV signal.
7.3 miles, 10 locks, 4.5 engine hours
7.3 miles, 10 locks, 4.5 engine hours
Thursday, 15 September 2016
Gnosall to the Wharf Tavern
Misty as we set out, but the sun came out in the afternoon, warm enough to dry the washing. Filled up with diesel at Norbury Junction, and checked their chandlery for tachometers, to no avail.
Came a bit further than CanalPlan suggested and tied up opposite the Wharf Tavern – first time we've stopped here.
70.77 litres at 59p/l & 30/70 split.
10.4 miles, 0 locks, 4.5 engine hours
Came a bit further than CanalPlan suggested and tied up opposite the Wharf Tavern – first time we've stopped here.
70.77 litres at 59p/l & 30/70 split.
10.4 miles, 0 locks, 4.5 engine hours
Wednesday, 14 September 2016
Shropshire Union Bridge 7 to Gnosall
Hot, sunny day. Washing went out in the cratch and dried easily as we travelled. The only lock was at Wheaton Aston, going down, so no danger to the washing from that.
Could have gone on past Gnosall, but we've got a little time in hand to get to Audlem for Sunday. Tied up in our now usual spot before the first bridge. TV signal is odd. Seems strong, but no ITV, Channel 4 or 5. However, good signal for the HD versions of all of those.
10 miles, 1 lock, 4.3 engine hours
Could have gone on past Gnosall, but we've got a little time in hand to get to Audlem for Sunday. Tied up in our now usual spot before the first bridge. TV signal is odd. Seems strong, but no ITV, Channel 4 or 5. However, good signal for the HD versions of all of those.
10 miles, 1 lock, 4.3 engine hours
Tuesday, 13 September 2016
Shropshire Union Bridge 7
Stayed put intending to do some painting. Orphan Mable rang with a vast price for the tachometer, so we didn't go ahead. Spent a lot of time researching alternatives. Did a wash, but by the time it was ready there was a thunderstorm.
Ran the engine for charging while the washing machine was on.
0 miles, 2 engine hours
Ran the engine for charging while the washing machine was on.
0 miles, 2 engine hours
Monday, 12 September 2016
Pendeford to Shropshire Union Bridge 7
Got down to Oxley Marine for just after 9 for the 1000 hour service, though had to wait for over an hour for Philip to come back from a call-out. Service went fine – no tappet adjustment needed. Everything looked clean and in good condition – including the fuel.
He greased the drive seal with silicone grease, and topped up the antifreeze to bring its SG to the correct level.
Philip removed the control panel to see whether there was anything obviously causing a problem with the tachometer. In the process the warning buzzer was corrected – probably a loose connection. Tachometer looks as though it has failed and will need to be replaced. Philip sealed the panel again with silicone from a gun, but it's a bit messy.
Then we backed to the junction, took on water at the first point on the Shroppie and came up to the rings between bridges 7 and 8.
4 miles, 1 lock, 2.6 engine hours
He greased the drive seal with silicone grease, and topped up the antifreeze to bring its SG to the correct level.
Philip removed the control panel to see whether there was anything obviously causing a problem with the tachometer. In the process the warning buzzer was corrected – probably a loose connection. Tachometer looks as though it has failed and will need to be replaced. Philip sealed the panel again with silicone from a gun, but it's a bit messy.
Then we backed to the junction, took on water at the first point on the Shroppie and came up to the rings between bridges 7 and 8.
4 miles, 1 lock, 2.6 engine hours
Sunday, 11 September 2016
Pendeford
Stayed put, and just enough sun not to need to run the engine. Went to church in St Paul's, Pendeford. Did some essentials shopping at Morrisons on the way back to Erin Mae.
0 miles
0 miles
Saturday, 10 September 2016
Deepmore Bridge to Pendeford
Followed a slowcoach to Cross Green, but this was a relatively short run. Nobody in the narrows. Tied up on the Armco at the end of the narrows.
4 miles, 0 locks, 1.5 engine hours
4 miles, 0 locks, 1.5 engine hours
Friday, 9 September 2016
Deptmore lock to Deepmore Bridge
Decided there was no need to call in a Penkridge or Gailey, so came all the way through Hatherton to the good moorings following Deepmore Bridge.
9.8 miles, 10 locks, 6 engine hours
9.8 miles, 10 locks, 6 engine hours
Thursday, 8 September 2016
Great Haywood to Deptmore Lock
Left after the morning rain had stopped. By that time there was little traffic in our direction, in contrast with eight boats waiting to come down Great Haywood lock. Took on water at the junction, and then came without a stop to moor up just round the curve above Deptmore lock.
Windy day, just a fleck or two of rain, but a sunny late afternoon.
7 miles, 3 locks, 3.8 engine hours
Windy day, just a fleck or two of rain, but a sunny late afternoon.
7 miles, 3 locks, 3.8 engine hours
Wednesday, 7 September 2016
Armitage to Great Haywood
Left the Ash Tree mid-morning and stopped in Rugeley for some shopping. Weather was fine and getting quite warm by the end. After lunch we cruised to the Taft and stopped to give the Thorns some left-over halyards from the Fazeley weekend, and to see if I could help with Julie's access to the website via her iPad.
Came through Colwich lock and tied up on the stretch before the ornamental bridge. Lots of boats around.
6.1 miles, 1 lock, 3.7 engine hours
Came through Colwich lock and tied up on the stretch before the ornamental bridge. Lots of boats around.
6.1 miles, 1 lock, 3.7 engine hours
Tuesday, 6 September 2016
Fradley to Armitage
Nice sunny day when we started out, though it got cloudier. Only short queues at Fradley and Wood End. Tied up outside the Ash Tree, and will eat there tonight.
7.6 miles, 3 locks, 1 swing bridge, 4.3 engine hours
7.6 miles, 3 locks, 1 swing bridge, 4.3 engine hours
Monday, 5 September 2016
Fazeley to Fradley
Cloudy day, but brightened up around 5 p.m. Got away from the mooring around 11.30 and went down to Fradley Mill Marina for a pump-out and a gas bottle. Then back up to Fazeley junction and turned left for Fradley. Took on water at the junction.
Tied up just before bridge 90 at Fradley, in the same spot as on the way down.
10.6 miles, 0 locks, 5 engine hours.
Tied up just before bridge 90 at Fradley, in the same spot as on the way down.
10.6 miles, 0 locks, 5 engine hours.
Sunday, 4 September 2016
Fazeley
Batteries down to 52 overnight, so didn't run the Webasto in the morning. Ran the engine for an hour after the BCF communion service, as there wasn't much sign of sun. SG gave the SOC as 65 after that, and then some sunshine pushed it up to 70 by late afternoon.
Gas bottle ran out first thing. We'd noted that it was low as we got to Fazeley, and that the other bottle was also not full. We assumed that the Gibsons had switched bottles, without us registering it, so both would be empty. Consequence: no tea for breakfast. However, I looked at the other bottle when we got back after the service, and it appeared to have some gas. Perhaps the Gibsons had switched bottles before the old one was empty. So we had gas for today.
Waste tank light came on in the afternoon. We're told we can get gas and a pump-out in the morning at the marina just a few hundred on from our mooring.
Gas bottle ran out first thing. We'd noted that it was low as we got to Fazeley, and that the other bottle was also not full. We assumed that the Gibsons had switched bottles, without us registering it, so both would be empty. Consequence: no tea for breakfast. However, I looked at the other bottle when we got back after the service, and it appeared to have some gas. Perhaps the Gibsons had switched bottles before the old one was empty. So we had gas for today.
Waste tank light came on in the afternoon. We're told we can get gas and a pump-out in the morning at the marina just a few hundred on from our mooring.
Saturday, 3 September 2016
Fazeley
Mostly rain and cloud, with a bit of sun in the afternoon. Batteries 65 to 55 during the day.
Friday, 2 September 2016
Thursday, 1 September 2016
Fradley to Fazeley
Sunny day for cruising. Some hold ups for slow boats. Tied up just short of the footpath up to St Paul's church in Fazeley
10 miles, 0 locks, 3.5 engine hours
10 miles, 0 locks, 3.5 engine hours
Wednesday, 31 August 2016
Rugeley to Fradley
Shopping first thing, under way at about 12.30 with weather getting warmer all the time. Only a brief queue at Wood End and Fradley, where we turned right on to the Coventry Canal. Tied up just past Bridge 90 – good armco (though slightly too broad for our hooks) and pretty quiet in spite of the proximity of the A38. CanalPlan had suggested by Bridge 90A, but this spot is much better.
Water at Fradley, just past the junction. Washing load run while travelling, and out on the Vango once we'd stopped.
9 miles, 3 locks, 1 swing bridge, 4.5 engine hours
Water at Fradley, just past the junction. Washing load run while travelling, and out on the Vango once we'd stopped.
9 miles, 3 locks, 1 swing bridge, 4.5 engine hours
Tuesday, 30 August 2016
Wolseley Bridge to Rugeley
Late start. Day very warm and sunny. Called in at the Taft for coffee with Julie, and then stopped to chat with Chris and Sharon of NB Krystyna. Tied up on the Rugeley visitor moorings, and by the time we thought about anything else, it was too late for shopping or moving, so we stayed put.
3 miles, 0 locks, 1.5 engine hours
3 miles, 0 locks, 1.5 engine hours
Monday, 29 August 2016
GH Marina to Wolseley Bridge
Started out after some final chat with Steve, and Dawn & Adrian. Good weather. Long queue at Colwich Lock. Tied up on the last mooring before Wolseley Bridge. Went to the pub to eat in the evening.
3 miles, 2 locks, 3 engine hours
3 miles, 2 locks, 3 engine hours
Subscribe to:
Posts (Atom)