Thursday 29 July 2021

Ashby Canal Bridge 5 to Atherstone

Had to wait for a conversation with Streethay before setting out. Nigel confirmed they could do the radiator system early next week, so we turned right at the end of the Ashby.

Mixed sun and cloud, no rain, quite strong winds at times. Had a lot of help going down the Atherstone locks.

Wanted to use the moorings above lock 1, but they were full, so went down and tied up in the 48 hour moorings below lock 5.

10.4 miles, 5 locks, 4.9 engine hours