Thursday 9 September 2021

Napton, Bridge 109 to Bridge 100, Oxford Canal

Went up to the Calcutt locks for water. Winded, and turned left at Napton Junction. Weather dull, getting a bit sunnier.

Ran two wash-loads. Tied up just before Bridge 100, and put the washing out on the towpath, until it began to rain in the afternoon. Some quite heavy squalls

SOC had been only 48 at 8 a.m., so started the engine then, well before travelling.

Counter: 477.2

5 miles, 0 locks, 4.1 engine hours