Following yesterday's installation of the solar gear, I connected up the SmartGauge, using 1.5 mm squared 3-core flex from B&Q. Running the electrics on the batteries tonight to start the synchronisation process.
Took Erin Mae across for a self-operated pump-out once the wind had dropped a little. Only 6 minutes on the pump, and since this was the first one since November it's possible not all the sludge was rinsed out. Engine started and ran sweetly.
Rang RCR to chase up the welcome pack.