Friday, 16 November 2018

GH Marina

Engineering completed:

Blacking (£600)
Tunnel Bands refreshed (£60)
Four new anodes ((£216)

£876

Erin Mae back on the mooring

Monday, 12 November 2018

GH Marina

Engineering collected Erin Mae from the mooring, to start blacking.