Mains electric was down to zero. Bought £60 = 461.54 units (KwH), as price is about to go up by over 30%.
Ran a wash load, after which the reading was 460.88.
Rubbed down the sags on the undercoat above LH kitchen window. Did another coat slightly thinned with WS.
Thursday, 29 August 2019
Monday, 26 August 2019
GH Marina
1st undercoat on LH kitchen window. Re-applied the masking tape to provide a bigger area, top to bottom.
Moved across to the other berth to facilitate removing RH kitchen window. Came out without much difficulty, though the inner wooden frame fell off. Removed silicone, rubbed down and applied Fertan.
Moved across to the other berth to facilitate removing RH kitchen window. Came out without much difficulty, though the inner wooden frame fell off. Removed silicone, rubbed down and applied Fertan.
Sunday, 25 August 2019
GH Marina
2nd coat of primer on LH kitchen window.
BBQ in the shade, while England / Stokes beat Australia.
Saturday, 24 August 2019
Friday, 23 August 2019
GH Marina
Drilled and tapped the extra M4 holes on the LH kitchen window, using the new Volkel tap and the cutting paste. Went very well.
Monday, 12 August 2019