Sunday 25 September 2011

Milton to Meaford

Set off just after 8.30, because of physio on Tuesday. Long day, a lot of it in the rain. Margaret did a lot of steering once we reached the Trent & Mersey, and also between linked locks when I was walking with the windlass. Good progress through Stoke, because the locks were mostly set in our favour.

Tied up close to the winding hole between Meaford and Stone, at the same spot we stayed on the way up.

12 miles, 13 locks, 1 lift bridge, 8 hours engine time.