Wednesday 4 July 2012

Great Haywood to Wolseley Bridge

Pump-out. Then out to the AW yard for ice-cream and a walk down to Haywood Lock. Back on the boat, we decided to continue, so down to Wolseley Bridge for the night. Ran the engine for extra time to ensure the batteries were charged.

2.5 miles, 2 locks, 4 hours engine.