Thursday 16 August 2012

Branston to Alrewas

Coping with ropes that had got wet, stupidly left both mooring hooks at the mooring. Quite a windy morning. Found a mooring spot right after Alrewas lock.

5 miles, 2 locks, 4 hours engine – left the engine running while the bread maker made bread.