Tuesday 21 July 2015

Skipton to Gargrave

Dull day with some drizzle. Ran the engine for an hour from 8 a.m. Got going about 11 a.m. Worked through the swing bridges with some wide beam hirers. Met a day boat with some friends of Mick's on board. Decided to come through the locks and have a late lunch – around 3.40 in the end. Plenty of space on the visitor moorings at Gargrave.

5.3 miles, 3 locks, 5 swing bridges, 5 engine hours.