Saturday 22 August 2015

Kildwick to Skipton

Got the car back to Enterprise in the morning. An email back from Cotswold gave hope for exchanging the damaged trainers, but the promised rain made us wait till after coffee before setting out. Tied up on the 24 hour mooring opposite Pennine. Got the shoes changed, bought some trousers for Margaret, then went to Morrisons.

This meant the only specific charging had been morning for 2 hours, plus the 2.5 hours of cruising. However, we'd been doing a wash during that time.

4.9 miles, 0 locks, 6 swing bridges, 4.5 engine hours