Set out around 10. Weather generally fine but windy. Warm end to the day.
Wind caused a problem at West Haddlesey Flood Lock – the junction between the river section and the Selby Canal proper. Thought we had to go to the pontoon to see what the lock was doing, but another boat was there. Tried to nudge up to let Margaret off the front, but the wind started to blow me on to the bank. Reversed hard back into the river, but too shallow for much traction. Meanwhile wind continued to blow me on to the bank. Eventually got just enough clearance to swing round and head for the lock, which was completely open anyway.
Good run through – did it in about 50 minutes less than CanalPlan suggested. But this must be the longest distance we've ever done in one day.
18.2 miles, 5 locks, 1 swing bridge, 6 engine hours