2 hours again enough in the heat. Thermostat continues to be OK.
Water at Sutton Wharf, then onto the 48 hour moorings just beyond the water point. An odd jetty on the off-side, with not enough rings in a composite plastic construction. Had to use thinner rope to make loops to run the mooring lines through. Had to use a spring, but even so it was not very satisfactory.
Nice iced latte from the café boat at the wharf.
5.7 miles, 2.5 hours engine