Saturday, 27 September 2014

L&L Bridge 32 to Rufford

Got the paperwork for the Liverpool link application sorted out at Burscough library. Then down the Rufford arm. A totally new mixture of gate / paddle apparatus for us. Tied up just after Bridge 7.

4.5 miles, 7 locks, 2 swing bridges, 4.8 hours engine