Tuesday 7 October 2014

Liverpool to Aintree (L&L Bridge 9)

Said farewell to Salthouse Dock at 10 a.m., after a delay for a boat leaving Albert Dock for the sea. John and Robert saw us through all the locks and the two swing bridges.

Heavy rain for quite a lot of the journey, so (a) a very late lunch, and (b) we tied up just after Bridge 9 instead of pushing on as originally intended. Several groups of youths sheltering under bridges as we passed, in various states of inebriation and/or friendliness.

12 miles, 6 locks, 2 swing bridges, 5.2 hours engine