Monday 6 May 2013

Bradeley Green to Bettisfield

Late start up through Grindley Brook locks. Difficulty in getting into the middle lock of the staircase because we hadn't let enough water in. After that, no locks, but 4 lift bridges which are harder work.

The canal shallow in places. Tied up between bridges 49 and 50 looking across the valley towards Welshampton on a lovely sunny evening.

10.3 miles,  6 locks (including the 3-lock Grindley Brook staircase),  4 lift bridges, 5.5 hours engine.