Thursday 23 May 2013

Whitchurch to Wrenbury (Bridge 22)

Very windy, with strong, squally showers. Can't turn right out of the Whitchurch arm, so winded at Bridge 31A. Very shallow, and the wind made it very difficult until I used it to bring the bows round while holding the stern on the tow path.

Down the Grindley Brook staircase without drama.

6.5 miles, 10 locks, 1 lift bridge, 7 hours engine time.